LGS construction is faster than traditional methods to manufacture and construct buildings when the construction schedule will be done by a combination system.

Combination process system is: design – detail – fabricate = DDF SYSTEM

The frames designed and panelized by high quality system such as FrameCad or Enduroframe, that will manage the program from design, detail to manufacture. The system is incredibly accurate, reducing the need for engineer involvement during the detail design, speeding up compliance, reducing engineering cost and minimizing room for error on-site.

After designed and manufactured, the pre-fabricated frame to be deliver and install on site.

It is does not matter how big or small, the waste is just 1% and all will be recycled eventually.

Frame like this can be complete in 3 days! It is incredible!

The below is how the project rolling. Two third of construction time was spent in the factory. That reduces the amount of on site work, reduces waste, weather effects, and speeds up the construction period.